Wednesday, April 12, 2017
Final Master Plan
Below is the final planning document that was adopted by the Docks and Harbors Board. This document summarizes the process, input, economic analysis and the master plans that were developed with the public. The final plan focuses on the preferred master plan and the economic and feasibility studies that supports the preferred plan.
Friday, February 17, 2017
Public Meeting #4 Summary: Preferred Master Plans
On the evening of February 16th the planning and engineering team presented the preferred master plan and cost estimates for the uplands to the public. Below is a summary of the plans and sketches that make up the preferred master plan that we presented. Based on input received by the public in attendance, these plans were met with great enthusiasm and were accepted as presented. If you have comments or input please comment using the link to the right.
Preferred Master Plans
Click on the link above to view PDF
Preferred Master Plans
Click on the link above to view PDF
Tuesday, February 7, 2017
Upcoming Meetings
Wednesday, February 15: Open Studio from 9 am to 3 pm - Yacht Club
Thursday, February 16: Public Presentation of a preferred plan option (2/16) - 6:30 pm - Yacht Club
Tuesday, February 21: Presentation to Yacht Club Membership - 7 pm - Yacht Club
Thursday, February 23: Brief Presentation to Docks & Harbors Board - regular Board Meeting - 5 pm - CBJ Chambers
Thursday, January 26, 2017
Open Studio Session and Public Meeting #3
At the second public meeting, a preferred conceptual master plan was selected by the public. Over the next two days, the planning and design team held a series of open studio sessions at the Yacht Club where the public was invited to help refine the conceptual plan. Over 50 participants including fishermen, business owners, UAS representatives, Port staff, and harbor users provided input on detailing the preferred plan. During the studio sessions Corvus Design, NorthWind Architects, and PND Engineers developed a detailed master plan that was presented at the January 19 public meeting. A summary of the information developed during the open studio sessions and public meeting #3 can be found below.
(Click the Link Above to View PDF)
Public Meeting #2
On January 17th, a public meeting was held at the Juneau Douglas High School. The meeting revisited the three conceptual plans (previously posted) and covered the economic data and analysis related the expansion of the marine service yard, new retail and commercial opportunities and housing options. Based on the public input at this meeting, a preferred conceptual master plan was developed (See below).
(Click Link Above to View PDF)